Mine | |
---|---|
Info
| |
Used for | Mine silver and forge into Coins |
Cost Solar | 150 |
A mine which produces Coins.
Upgrade to increase the capacity.
Storage | Production Rate (Per Hour) |
HP | Cost (Solar needed) |
Duration | |
---|---|---|---|---|---|
Level 1 |
800 | 200 | 150 | 150 | 1M |
Level 2 |
1000 | 400 | 400 | 300 | 3M |
Level 3 |
1500 | 600 | 500 | 700 | 15M |
Level 4 |
2500 | 800 | 550 | 1400 | 1H |
Level 5 |
10000 | 1000 | 590 | 3500 | 4H |
Level 6 |
20000 | 1300 | 610 | 7000 | 12H |
Level 7 |
|||||
Level 8 |
50000 | 1900 | 660 | ||
Level 9 |
75000 | 2200 | 680 | 56000 | 3D |
Level 10 |
100000 | 2500 | 710 | 84000 | 4D |